KINERJA BADAN PENANGGULANGAN BENCANA DAERAH DALAM REKONSTRUKSI DAN REHABILITASI PASCA BENCANA DI RELOKASI PANDU KECAMATAN MAPANGET KOTA MANADO
Abstract
The impact of the flash floods that occurred in early 2014 in manado caused tens of thousands of people to become victims and evacuated, and resulted in dozens of houses being damaged. Reconstruction and rehabilitatiton through the construction of relocation housing in Manado is also a reference as is the vision of the Manado City government, namely sustainable regional development through the Regional Disaster Manajement Agency. IN its implemention, it has many effects, including avoiding people from disaster- prone aeras as well as creating newregion and social life. This study aims to determine the performance of the Manado City Regional Disaster Management Agency (BPBD) in Post- Disaster Reconstruction at Pandu Relocation, Mapanget District, Manado City. The data analysis technique used is a qualitative descriptive technique in accordance with the data and facts in the field, intended to thoroughly examine the research problem. The results of this study indicate that the BPBD in the construction of relocation housing has not been expected. In this case, it is caused by problems that arise, among others, related to inadequate tools/facilities. From the results of measuring the performance level of activity cycle indicators, it was found that olny 650 household heads lived out of the 2054 units built. Coupled with the limited human resources responsible for manado relocation housing.
Abstraksi
Dampak banjir bandang yang terjadi pada awal tahun 2014 di manado menyebabkan puluhan ribu orang menjadi korban dan mengungsi, serta mengakibatkan puluhan rumah rusak. Rekonstruksi dan rehabilitasi melalui pembangunan rumah relokasi di Manado juga menjadi acuan sebagaimana visi pemerintah Kota Manado yaitu pembangunan daerah yang berkelanjutan melalui Badan Penanggulangan Bencana Daerah. Dalam pelaksanaannya banyak dampaknya, antara lain menghindarkan masyarakat dari wilayah rawan bencana serta menciptakan kawasan dan kehidupan sosial baru. Penelitian ini bertujuan untuk mengetahui kinerja Badan Penanggulangan Bencana Daerah (BPBD) Kota Manado dalam Rekonstruksi Pascabencana di Relokasi Pandu Kecamatan Mapanget Kota Manado. Teknik analisis data yang digunakan adalah teknik deskriptif kualitatif sesuai dengan data dan fakta di lapangan, dimaksudkan untuk menelaah masalah penelitian secara menyeluruh. Hasil penelitian ini menunjukkan bahwa BPBD dalam pembangunan rumah relokasi belum sesuai harapan. Dalam hal ini disebabkan oleh permasalahan yang muncul antara lain terkait dengan alat/fasilitas yang kurang memadai. Dari hasil pengukuran tingkat kinerja indikator siklus kegiatan diketahui bahwa dari 2.054 unit yang dibangun hanya ada 650 kepala keluarga yang tinggal. Ditambah lagi dengan keterbatasan sumber daya manusia yang bertanggung jawab atas relokasi perumahan manado.
References
Bastian, Indra. (2005) Akuntasi Sektor Publik Jakarta: Penerbit Erlangga
Bernadin, H. Jhon., Russel, Joyce E. A. (2013), AnExpimetalApproach. Singapore : Mc. Graw – Hill book.co
Bernaddin, O., dan Russel, D. (2015).
Perilaku Organisasi Terjemahan Jilid 3.
Yogyakarta: Andi Offset Dra.H. Salidi Samsudin, M.M.M.Pd
(2010) Manajemen Sumber Daya Manusia.
Bandung Penerbit Pustaka Setia Fattah Al. Hanif. 2007
Analisis dan rancangan sistem Informasi.
Andi : Yogyakarta
Fahmi, Irham. 2016.
Pengantar manajemen sumber daya manusia konsep dan Kinerja.
Jakarta : Mitra Wacana Media.
Gomes. Faustino Cardoso. 2013. Manajemen sumber daya Manusia. Andi. Yogyakarta
Hasibuan, Malayu Sp. 2012.
Manajemen SDM. Edisi Revisi, Cetakan Ke Tujuh.
Jakarta : Bumi Aksara
Poerwadarminta E.JS. 2010:159. Kamus Umum Bahasa Indonesia Jakarta: Balai Pustaka
Prawirosentono, Suyadi. 2014.
Manajemen Sumber Daya Manusia : Kebijakan Kinerja Karyawan : Kiat Membangun Organisasi Kompetitif Era Perdangangan Bebas Dunia.
Rajawali Press: Jakarta
Robbins, Stephen P ., 2008
Perilaku Organisasi (alih bahasa Drs, Benjamin Molan), Edisi Bhasa Indonesia, PT Intan Sejati, Klaten.
Rivai, Veithzal, 2012.
Manajemen Sumber Daya Manusia Untuk Perusahaan.
Jakarta : Raja Grafindo Persada.
Sadili Samsudin. 2010.
Manajemen Sumber Daya Manusia.
Bandung :CV. Pustaka Setia Sedarmayanti. 2011.
Manajemen sumber daya manusia. Edisi revisi.
Jakarta: Bumi Aksara Sugiyono (2011).
Metode Penelitian Kuantitatif Kualitatif dan R&D.
ALFABETA
Ulum, Ihyaul. 2009. “Intellectusl Capital : Konsep dan Kajian Empiris”. Yogyakata : Graha Ilmu
UNDANG-UNDANG
Undang-undang Republik Indonesia Nomor 24 tahun 2007 Tentang Penanggulangan Bencana
Keputusan Gubernur Sulawesi Utara, Nomor 221 Tahun 2015 Tentang Penetapan lahan untuk relokasi pemukiman.
Keputusan Walikota Manado 95 a/KEP/LT.12/BPBD/2016 Tentang Penerima dana bantuan rumah.
Peraturan Walikota Manado Nomor 32 Tahun 2009 Tahun 2009 Tentang pembentukan Badan Penanggulangan Bencana Daerah Kota Manado.
Peraturan Pemerintah Nomor 11 Tahun 2008 Tentang Pedoman Rehabilitasi dan Rekonstruksi Pasca Bencana
keputusan Kepala Pelaksana Badan Penaggulangan Bencana Daerah Kota Manado Nomor 12 Tahun 2018 tentang Penetapan kelompok masyarakat (POKMAS) Kegiatan rehabilitasi dan Rekonstruksi sector perumahan dan permukiman berbasis (relokasi tahap II)
Full Text: PDF
Refbacks
- There are currently no refbacks.